Customer - International Energy Corporation (MEK)
Works performed
- Installation of 110/35 kV "Sevan" HPP
- Dismantling of 35 kV oil circuit breakers
- Installation of 35 kV gas-insulated circuit breakers
- Transportation of 47 tons cargo from Kanaker HPP to Gyumush HPP
------------------------------------------------------------------------------------------------------------
Customer - K-Telecom (Vivacell)
Contractor - Intracom
Project - Installation of towers - 6 pcs.
Works performed
- Digging of foundations 8 x 8 x 5 m
- Installation r / concrete foundations (monolith)
- Assembly the tower with 35-42 m height of galvanized steel / Structure
- Installation of tower to the foundation
- Mounting and installation of diesel generators under these tower
- Installation of communicational panels and cables
------------------------------------------------------------------------------------------------------------
Customer - “High Voltage Electrical Networks”
Project - Replacement of the burnt transformer with new 125,000 kVA one at 220 kV "Marash ” substation
Works performed
- Dismantling the burnt transformer
- Manualy rigging to the trailer and transportation in the territory of Substation, unloading on the sleeper cell
- Preparation and construction of a new NSP-3 foundation under the transformer
- Unloading by manualy rigging and Installation of new 125,000 kVA transformer
- Manufacturing and installation of SHAOT panels
- Measurements, commissioning and testing
------------------------------------------------------------------------------------------------------------
Customer - “High Voltage Electrical Networks”
Project - Transportation of transformer from Vanadzor -2 substation to Yerevan
Works performed
- Dismounting of 63000 kV transformer
- Loading by manualy rigging
- Transportation of transformer from Vanadzor to the 220kV Akhtanak substation in Yerevan
- Unloading to the foundation and installation of transformer
------------------------------------------------------------------------------------------------------------
Customer - “Electrical Networks of Armenia”
Facility - TP - 581 in Yerevan
Works performed
- Construction of TP – 1*630 kVA substation building
- Mounting and installation of 630 kVA transformer
- Manufacturing and installation of 1 section 10kV feeder KSO-10 and SHO-70 Panels
- transfer of all cable lines and connect to new customers
------------------------------------------------------------------------------------------------------------
Customer - “Hidroenergoshin”
Facility - TP - 2 х 400 kVA in Davidashen st. and TP - 2 х 400 kVA in Babajanyan st. , Yerevan
Works performed
- Manufacturing and installation of 2 section 10kV feeder KSO-10 and SHO-70 Panels
- Installation and adjustment of Automatic Reserve Panel
- Installation of 400 kVA transformer
------------------------------------------------------------------------------------------------------------
Customer - “High Voltage Electrical Networks”
Project - Repair of transformers in 220 kV “Gyumri” substation - 125000 kVA
and 32000 kVA and in “Шаумян-2” substation - 125000 kVA
Works performed
- Dismounting insulators and cooling system
- Replace all rubber pads
- repair and inspections of electric motors, valves, safety valves
- Repair of the tap changer
- Revision and adjustment of gas relay
- External Painting
- Degasing and dring of transformer oil
- Adjustment and integrated measurement
Customer - International Energy Corporation (MEK)
Works performed
- Installation of 110/35 kV "Sevan" HPP
- Dismantling of 35 kV oil circuit breakers
- Installation of 35 kV gas-insulated circuit breakers
- Transportation of 47 tons cargo from Kanaker HPP to Gyumush HPP
------------------------------------------------------------------------------------------------------------
Customer - K-Telecom (Vivacell)
Contractor - Intracom
Project - Installation of towers - 6 pcs.
Works performed
- Digging of foundations 8 x 8 x 5 m
- Installation r / concrete foundations (monolith)
- Assembly the tower with 35-42 m height of galvanized steel / Structure
- Installation of tower to the foundation
- Mounting and installation of diesel generators under these tower
- Installation of communicational panels and cables
------------------------------------------------------------------------------------------------------------
Customer - “High Voltage Electrical Networks”
Project - Replacement of the burnt transformer with new 125,000 kVA one at 220 kV "Marash ” substation
Works performed
- Dismantling the burnt transformer
- Manualy rigging to the trailer and transportation in the territory of Substation, unloading on the sleeper cell
- Preparation and construction of a new NSP-3 foundation under the transformer
- Unloading by manualy rigging and Installation of new 125,000 kVA transformer
- Manufacturing and installation of SHAOT panels
- Measurements, commissioning and testing
------------------------------------------------------------------------------------------------------------
Customer - “High Voltage Electrical Networks”
Project - Transportation of transformer from Vanadzor -2 substation to Yerevan
Works performed
- Dismounting of 63000 kV transformer
- Loading by manualy rigging
- Transportation of transformer from Vanadzor to the 220kV Akhtanak substation in Yerevan
- Unloading to the foundation and installation of transformer
------------------------------------------------------------------------------------------------------------
Customer - “Electrical Networks of Armenia”
Facility - TP - 581 in Yerevan
Works performed
- Construction of TP – 1*630 kVA substation building
- Mounting and installation of 630 kVA transformer
- Manufacturing and installation of 1 section 10kV feeder KSO-10 and SHO-70 Panels
- transfer of all cable lines and connect to new customers
------------------------------------------------------------------------------------------------------------
Customer - “Hidroenergoshin”
Facility - TP - 2 х 400 kVA in Davidashen st. and TP - 2 х 400 kVA in Babajanyan st. , Yerevan
Works performed
- Manufacturing and installation of 2 section 10kV feeder KSO-10 and SHO-70 Panels
- Installation and adjustment of Automatic Reserve Panel
- Installation of 400 kVA transformer
------------------------------------------------------------------------------------------------------------
Customer - “High Voltage Electrical Networks”
Project - Repair of transformers in 220 kV “Gyumri” substation - 125000 kVA
and 32000 kVA and in “Шаумян-2” substation - 125000 kVA
Works performed
- Dismounting insulators and cooling system
- Replace all rubber pads
- repair and inspections of electric motors, valves, safety valves
- Repair of the tap changer
- Revision and adjustment of gas relay
- External Painting
- Degasing and dring of transformer oil
- Adjustment and integrated measurement